Here’s an updated map of the EastLink alignment. In late 2016, after community input and further study by the project team, a new alignment for EastLink  was developed.  The alignment was adjusted to the west in order is to use the future, multi-modal Tilley Street through Mueller, which links East 51st to the Mueller Southeast Greenway and Manor Road.

EastLink_GAPS_2016.08.24.ai

Find details on the gaps in EastLink here:

1478560812_pdf Download – Project Map

1478560812_pdf Download – Gap Map 1A

1478560812_pdf Download – Gap Map 3A

1478560812_pdf Download – Gap Map 3B

1478560812_pdf Download – Gap Map 4A